Copper

Refined copper for windings, cables and wiring. World mine supply is concentrated and slow to expand; price and supply growth are the observed components, inventory, utilisation and lead time have no registered source.

Statusinsufficient datathresholds bottleneck_thresholds_v1as of 2026-07-01, computed 2026-09-07 22:36 UTC

Reading

In plain words

generated from the stored numbers, rule bottleneck_thresholds_v1

Pressure is 85 on a 0 to 100 scale (the weighted 85th percentile of its components' own histories) with 1 of 6 components available, 25 percent of the weight, as of 2026-07. That is below the 50 percent coverage the thresholds require, so no pressure label is given. Missing: Supply growth gap, Producer concentration, inventory depletion, utilization and 1 more. No response signal is registered for this record (no capacity pipeline is registered for copper and the only curated copper producer (Freeport-McMoRan) belongs to no capex pulse group). Adding capacity takes 10 to 20 years by the cited source, so today's response is read against that horizon.

rules fired: coverage 0.25 < 0.5

Is the problem being solved?

Pressure and response

pressure Modeled response Modeled
  • pressure0 to 100, left
  • responsenone, right
Copper: pressure and response over time0255075100watch 60constrained 751995-122000-042004-092009-012013-062017-102022-032026-07PRESSURE (WEIGHTED PERCENTILE)pressure
Pressure: 368 period(s), 1995-12 to 2026-07. Response: no value stored. The two scales are independent; the lines are read against their own thresholds, never against each other.
PressureModeled

85

0 to 100, coverage 25%, 1 of 6 components, as of 2026-07

Response

--

no response signal registered

no capacity pipeline is registered for copper and the only curated copper producer (Freeport-McMoRan) belongs to no capex pulse group

no capacity pipeline is registered for copper and the only curated copper producer (Freeport-McMoRan) belongs to no capex pulse group

Pressure components

Percentiles, weights and what is missing

weights sum to 1; missing components count against coverage
ComponentWeightSeries and transformPercentileRawPeriodHistoryStatus
Price pressure
12-month percent change of the IMF global copper price (FRED PCOPPUSDM)
0.25copper-price WLD
pct_change_12
85.4838.60822026-07-01403present
obs 156367, 156368, 156369 ...
Supply growth gap
world mine production growth (USGS), sign reversed: slower growth ranks as more pressure
0.2copper-mine-production WLD
yoy_growth_negated
--------missing
2 observation(s) of copper-mine-production give 1 transformed period(s), fewer than the 5 the rank needs
Producer concentration
share of world mine production from the three largest producing countries (derived from USGS)
0.15copper-top3-concentration WLD
level
--------missing
2 observation(s) of copper-top3-concentration give 2 transformed period(s), fewer than the 5 the rank needs
inventory depletion
Exchange and reported inventories relative to consumption.
0.15no registered series--------missing
no copper inventory series is registered; cot-copper-managed-money-net is futures positioning, not inventory, and is not used
candidates: LME warehouse stocks; COMEX warehouse stocks; SHFE weekly stocks
utilization
Smelter and refinery utilisation.
0.15no registered series--------missing
no copper smelting or refining utilisation series is registered
candidates: ICSG monthly bulletin
lead time
Delivery lead time for refined copper or copper products.
0.1no registered series--------missing
no copper lead-time series is registered
candidates: ISM supplier deliveries (not copper-specific); producer surveys

Response detail

What the response signal rests on

no capacity pipeline is registered for copper and the only curated copper producer (Freeport-McMoRan) belongs to no capex pulse group

Downstream

Systems that depend on it

within 3 hops, centrality_v1
EntityTypeHopsCentrality
Power transformerproduct17.7
Residential constructionindustry11
Transmission and distribution gridinfrastructure_system26.7
Housing stockinfrastructure_system20
Electricity systeminfrastructure_system34.6
Data centerfacility31.75

Substitutes

Named on the dependency edges

  • Primary aluminum for power-transformer
    Aluminum windings, larger cross-section for the same current; common in distribution transformers.
  • Primary aluminum for residential-construction
    Aluminum branch wiring and service entrance cable at a larger gauge.
  • Primary aluminum substitutes_for edge
    Aluminum substitutes for copper in power cables, busbars and some transformer windings where weight and cost outweigh its lower conductivity.

Recycling and recovery: Recycled scrap is a significant secondary supply of refined copper (USGS); no scrap series is registered.

Expansion lead time

120 to 240 months

Recommended

New copper mine, discovery to first production

Mining projects across critical minerals; copper is at the long end because of scale, ore grade and permitting.

International Energy Agency, The Role of Critical Minerals in Clean Energy Transitions (2021)

It has taken 16.5 years on average to move mining projects from discovery to first production.

checked 2026-09-07

Evidence

Every number, by id

Bottleneck and Response monitor, model bottleneck_assessment_v1, thresholds bottleneck_thresholds_v1

A record shows two signals and never combines them.

Pressure (modeled): each available component is transformed (12-month percent change, year-over-year growth with the sign reversed for supply, level for shares and lead times), then replaced by its percentile rank (0 to 100) within its own stored history up to that period, ties counted half, after a minimum history. The score is the weighted mean of those ranks over the components present, renormalised. Coverage is the share of declared weight that has data; components without a registered source are declared with their weight, their role and candidate sources, and count against coverage. Weights are a modelling choice and are listed on every record.

Response: the capacity response ratio where a capacity pipeline exists (US electricity: the stage-weighted 24-month EIA-860M pipeline over the trailing 24 months of additions, modeled), otherwise the capital expenditure pulse of the tagged company group (matched-sample trailing-four-quarter capex growth from stored 10-K and 10-Q facts, derived), otherwise null with the reason.

Status comes only from these thresholds:

  • insufficient data: coverage below 0.5, or no pressure score. No label is guessed.
  • below watch: pressure below 60.
  • watch: pressure at or above 60 and below 75.
  • constrained: pressure at or above 75.
  • constrained, response underway: constrained and the response signal clears its threshold (capacity response at or above 1.0, or capex pulse above 10 percent).

Lead time is recommended-class metadata from a small sourced table (src/data/lead-times.ts) and is stored with its citation. Substitutes and downstream systems come from the curated knowledge graph (edges where the record's entity is the dependency; entities within three hops that depend on it, with centrality_v1). Every number on a record traces to stored observation ids, pulse row ids or edge ids in the row's JSON.

History

Assessments stored

As ofPressureCoverageResponseStatusComputed
2026-07-018525%--insufficient data2026-09-07