US future capacity pipeline, 36 months

Modeled

Stage-weighted nameplate capacity expected online in the United States within 36 months, from EIA's planned generator inventory. Weights are assumptions.

Ingestedfrom Humanity VectorfreshJSON export
Current value, United States
133,203.6MW
period 2026-07-01
Geography
United States (USA)
Observation date
2026-07-01
Unit
MW
Frequency
monthly
Ingested
2026-09-07 22:15 UTC
1-year change+2,761.55contextual+2.12%2026-06-01 to 2026-07-01from 130,442.05 to 133,203.6 MW
10-year trend+1.23% per yearcontextual+13.04%2025-09-01 to 2026-07-01compound annual growth rate; total +15,363.7 MW, from 117,839.9 to 133,203.6 MW
Historical series

US future capacity pipeline, 36 months, United States

Modeled
110,000115,000120,000125,000130,000135,0002025-07-012025-09-012025-11-012026-01-012026-03-012026-05-012026-07-01MW133,203.6
13 observations, 2025-07-01 to 2026-07-01latest point emphasised
Data table (13 rows)
US future capacity pipeline, 36 months, United States: 13 observations from 2025-07-01 to 2026-07-01, values from 113,599.85 to 133,289.45 MW. Latest 133,203.6 MW in 2026-07-01. Full data table below.
PeriodValue (MW)Source revisionIngested at
2026-07-01133,203.595v1.0/860M-2026-072026-09-07 22:15 UTC
2026-06-01130,442.045v1.0/860M-2026-062026-09-07 22:15 UTC
2026-05-01128,371.515v1.0/860M-2026-052026-09-07 22:15 UTC
2026-04-01130,164v1.0/860M-2026-042026-09-07 22:15 UTC
2026-03-01133,289.445v1.0/860M-2026-032026-09-07 22:15 UTC
2026-02-01123,692.075v1.0/860M-2026-022026-09-07 22:15 UTC
2026-01-01124,085.52v1.0/860M-2026-012026-09-07 22:15 UTC
2025-12-01122,670.58v1.0/860M-2025-122026-09-07 22:15 UTC
2025-11-01118,670.365v1.0/860M-2025-112026-09-07 22:15 UTC
2025-10-01118,828v1.0/860M-2025-102026-09-07 22:15 UTC
2025-09-01117,839.895v1.0/860M-2025-092026-09-07 22:15 UTC
2025-08-01113,599.845v1.0/860M-2025-082026-09-07 22:15 UTC
2025-07-01116,070.55v1.0/860M-2025-072026-09-07 22:15 UTC
1 geographies have observations for this metric
Humanity Vector, Humanity Vector documented derivations, series capacity-model
Definition

What this measures

Sum of nameplate MW over EIA-860M planned generators with a planned operation date at or before the data month plus 36 months, each weighted by its status: planned (EIA codes P, L, OT) 0.3; permitted (T) 0.6; under construction (U, V) 0.9; testing (TS, construction complete) 0.95. One value per data month of a loaded EIA-860M file. See the methodology for the weights and their limits.

Direction
contextual, not scored
Geography level
country
Slug
us-future-capacity-pipeline-36m
Energy

Related metrics

Provenance and methodologysource, series, ingestion, revisions
Classification
Modeledan estimate that depends on assumptions
Source organization
Humanity Vector, Humanity Vector documented derivations
Series ID
capacity-model
Source links
License and attribution
Public display approved
Humanity Vector, derived from cited sources, formulas published on the metric page
Last source update
v1.0/860M-2026-07(source revision label as published by the provider)
Last ingestion
last successful runfresh
Last run
success2026-09-07 22:15 UTC
Parser version
humanity-vector-capacity/1.0.0
Methodology version
1.0
Formula
pipeline_36(M) = sum(nameplate_MW x weight(status)) over planned rows with planned_operation_at <= M + 36 months
Method versions
Version 1.0, effective 2026-09-07 00:00 UTCpipeline_36(M) = sum(nameplate_MW x weight(status)); weights planned (EIA codes P, L, OT) 0.3; permitted (T) 0.6; under construction (U, V) 0.9; testing (TS, construction complete) 0.95

Future capacity pipeline, 36 months, version 1.0

What it is. A modeled estimate of the nameplate generation capacity (MW) that will come online in the United States within the next 36 months, from EIA's planned generator inventory (Form EIA-860M) weighted by how far each project has progressed. It is not a forecast of what will be built; it is the reported pipeline discounted by stage.

Formula. For the data month M of an EIA-860M file, over every row of the Planned sheet (stored in capacity_projects with source eia_860m and file month M):

pipeline_36(M) = sum over rows with planned operation date at or before M + 36 months of nameplate_MW x weight(status)

Weights (version 1.0). planned (EIA codes P, L, OT) 0.3; permitted (T) 0.6; under construction (U, V) 0.9; testing (TS, construction complete) 0.95. Rows whose planned operation date is before M (overdue projects still listed as planned) are included in every horizon; rows without a date are excluded and their MW reported in the observation metadata as undated.

Why these weights. They are round assumptions ordered by stage, chosen so that construction counts almost fully and paperwork counts a little. They are not fitted to historical completion rates. A later version may replace them with observed completion rates by status and technology from the same source; until then every value carries the modeled badge.

Components. Observed: capacity_projects rows from the EIA-860M Planned sheet (plant, generator, technology, nameplate MW, planned operation month, status code). Each observation stores the unweighted MW by status, the weights used, the weighted MW by status, the overdue and undated MW, and the file's sha256.

Limits. EIA excludes facilities under 1 MW. Developers report planned dates that slip; the same generator can appear for years. Cancellations move rows to a separate sheet and drop out of the pipeline only in the file after they are reported.

Quality and confidence
Modeled: the status weights are assumptions recorded in the methodology version, not measured completion rates. Every observation stores the unweighted components.
Ingestion rejects values outside 0 to 2,000,000 MW.
13 periods with values for this geography, 2025-07-01 to 2026-07-01.
Revisions
Values reported for the latest period (2026-07-01) by each source revision ingested. Earlier rows are never deleted; the newest ingested row is shown as current.
Source revisionValue (MW)Ingested atStatus
v1.0/860M-2026-07133,203.5952026-09-07 22:15 UTCcurrent
No superseded rows for this geography: every period has been ingested once.